Bathroom reconstruction

Orlando

   When we arrived at the bathroom, we noticed that the walls were still damp. Before starting the demolition, we encapsulated the area and used a dehumidifier to prevent mold from spreading and to protect the other inhabited areas. The demolition was carried out efficiently the following day, once we ensured everything was thoroughly dry. We replaced the water fixtures, applied a moisture barrier, and then installed Durock and waterproof paint. Finally, we added the tiles chosen by the client, enhanced the bathroom lighting, and updated the toilet, vanity, faucets, mirrors, and painted all the walls, resulting in a spectacular transformation